New roadway Cacovo

31 Jan 2024

The construction works on the Cacovo roadway in Donja Lastva were completed at the end of December last year. A roadway approximately 450 meters long was built, along with all related infrastructure elements. The construction works for the third phase of this road amounted to €300,000. The works were carried out by the company "Betonmix" Ltd. from Budva.

"The works in this phase were completed on schedule. The contractor adhered to the agreed schedule for the execution of works, and thus, we managed to bring the project to completion, which has been ongoing since the end of 2016. Various problems were encountered, ranging from terrain configuration, deficiencies in project documentation to property issues," said Vlado Brguljan, the director of the Directorate for Investments. He added that within this project, electrical works were carried out, supporting wall structures were built, a water supply and sewage system were installed, atmospheric drains were arranged, and asphalt works were completed.

"With this, about ten houses in Donja Lastva finally gained vehicular access, and we have concluded a multi-year infrastructure project done in phases, of which the first two phases amounted to around €360,000. I am pleased that we have successfully completed this project and that we can now focus our efforts on some new and significant projects," said Željko Komnenović, the president of the municipality.

post slika